Interior Door Delivery, Inspection & Storage: Complete Guide

Your new interior doors represent a significant investment in your home, one that deserves protection from the moment they arrive at your doorstep. Yet every year, homeowners unknowingly damage perfectly crafted doors through improper receiving, careless inspection, or inadequate storage. A door that survived precision CNC manufacturing, a seven-layer lacquer finish process, and hundreds of miles of freight transit can be ruined in minutes by leaning it against a garage wall in January or stacking it on a damp concrete floor.

We wrote this guide because we want every door that leaves our Orlando facility to look just as flawless on installation day as it did the moment it rolled off the production line. Whether you ordered a single bathroom door or a whole-house set of fifteen, the steps below will walk you through exactly how to receive your LTL freight delivery, conduct a thorough inspection, file a claim if something isn’t right, acclimate your doors to your home’s environment, and store them safely until your installer, or you are ready to hang them. Follow these steps, and you’ll protect your investment from day one.

Understanding LTL Freight Delivery

If you’ve never received a freight shipment before, the experience is quite different from a standard package delivery. At doorbuyer.com, we ship exclusively via LTL (Less Than Truckload) freight and there’s a very good reason for that.

What Is LTL Freight Shipping?

LTL freight is a commercial shipping method where your goods share trailer space with other shipments but travel on pallets, fully secured and protected. Unlike ground shipping services such as UPS or FedEx, which toss boxes onto conveyor belts and stack them in delivery trucks, LTL freight keeps your doors on a sturdy pallet from our warehouse dock to your delivery location. A forklift loads them, a forklift unloads them, and human hands never casually toss them around.

Why We Use LTL Instead of Ground Shipping

Interior doors are heavy, long, and finished with a delicate lacquer surface. Ground shipping networks are designed for boxes and envelopes, not six-foot slabs of solid wood. Here’s why LTL is the only method we trust:

•             Maximum damage protection. Doors remain palletized and strapped throughout transit rather than tumbling on conveyor systems.

•             Weight capacity. A single interior door can weigh 150–190 pounds. A pallet of eight to ten doors can exceed 1300 pounds, far beyond ground shipping limits.

•             Insurance coverage. Every shipment is insured against transit damage.

•             Professional handling. Freight carriers use forklifts and loading docks, not hand-thrown sorting facilities.

•             Pallet integrity. We pack 8–10 doors per pallet, with protective wrapping, corner guards, and banding to keep everything secure.

Think of it this way: ground shipping is designed for a pair of shoes. LTL freight is designed for a baby grand piano. Your doors deserve the piano treatment.

What to Expect on Delivery Day

A full-size freight truck (or sometimes a smaller straight truck) will arrive at your home. The driver will contact you to schedule a delivery appointment window, typically a four-hour block. Unlike a UPS driver who drops a box and leaves, a freight driver will need your involvement:

•             You’ll need to be present (or have a designated representative present).

•             The driver will use a liftgate to lower the pallet to the ground if you don’t have a loading dock (most homes don’t).

•             Delivery is to curbside or driveway; the driver is not required to bring the pallet inside your home or garage.

•             You will sign a delivery receipt, which is a legal document.

This last point is critical, and we’ll cover it in detail below.

Preparing for Delivery Day

Proper preparation makes delivery day smooth and stress-free. Here’s your timeline and checklist.

Understanding the Timeline

When you place an order with doorbuyer.com, your doors enter our 7-day production cycle at our Orlando, Florida manufacturing facility. Our team of 13 CNC machines and skilled craftsmen build your doors to your exact specifications, including custom sizes at no extra charge.

After production, your palletized doors ship via LTL freight. Shipping transit time is an additional 2–7 days, depending on your location relative to central Florida. The further you are, the longer transit takes.

Total timeline from order to delivery: approximately 9–14 days.

Phase

Duration

What’s Happening

Production

7 days

CNC cutting, hardware prep, quality inspection, palletizing

LTL Freight Transit

2–7 days

Palletized shipment via insured freight carrier

Total

9–14 days

Order to your door

Tracking Your Shipment

Once your doors ship, you’ll receive tracking information via email. LTL freight tracking works differently from ground shipping, updates may be less frequent, but you can typically see when your shipment arrives at the local freight terminal. The carrier will then call you to schedule your delivery appointment.

Your Delivery Day Checklist

Have the following ready before the truck arrives:

•             Clear path. Ensure the driveway or delivery area is accessible for a large truck. Move vehicles, trash cans, and obstacles.

•             Space for the pallet. A pallet of 8–10 doors is approximately 7 feet long, 4 feet wide, and 2–3 feet tall. You need that footprint clear in your garage, driveway, or covered area.

•             Unpacking tools. Box cutter or utility knife, pliers or wire cutters (for pallet banding), and a pry bar if needed.

•             Camera or smartphone. You’ll be taking photos, lots of them.

•             A helper. Doors are heavy. Plan on having at least one other person available to help move them off the pallet and into storage. Each door can weigh 150–190+ pounds depending on size and configuration.

•             The delivery receipt. Have a pen ready. You’ll be signing a document.

Delivery Location Considerations

Ideally, have the driver deliver to your garage or a covered area. If that’s not possible, the driveway works but have a plan to move the doors inside quickly, especially if rain is in the forecast. Leaving doors exposed to weather, even briefly, can cause moisture damage to the natural oak veneer and lacquer finish.

Receiving the LTL Freight Shipment

When the truck arrives, here’s what to expect and do.

Receiving the LTL Freight ShipmentReceiving the LTL Freight Shipment

The Driver’s Role

The freight driver will:

•             Back the truck as close as possible to your delivery point.

•             Use a liftgate (a hydraulic platform on the back of the truck) to lower the pallet to ground level.

•             Move the pallet to the edge of the truck or onto the ground using a pallet jack.

•             Present you with a Bill of Lading (BOL) or delivery receipt to sign.

Your Role

The driver is responsible for getting the pallet off the truck. You are responsible for moving it from the delivery point into your home, garage, or storage area. The driver is not required to carry doors inside or place them in a specific room. They’re on a tight schedule with multiple deliveries, so be ready to work efficiently.

Time Constraints

Freight drivers typically allow 15–30 minutes for residential deliveries. Have your inspection done promptly (see next section) so the driver isn’t waiting unnecessarily. That said, never let time pressure cause you to skip your inspection. A thorough check takes only a few minutes and can save you thousands.

Initial Inspection: Before You Sign the Delivery Receipt

This is the single most important step in the entire receiving process. Once you sign the delivery receipt without noting damage, it becomes significantly harder to file a successful freight claim. Treat the delivery receipt like a legal document, because it is one.

What to Inspect Before Signing

Walk around the entire pallet and check:

1.          Pallet condition. Is the pallet intact? Broken boards, crushed corners, or a tilting pallet suggest rough handling.

2.          Wrapping and packaging. Is the stretch wrap torn, punctured, or missing? Are corner protectors still in place?

3.          Visible door damage. Can you see any cracked, split, or broken doors through the wrapping? Any obvious dents or punctures?

4.          Door count. Does the number of packages or visible doors match your order?

5.          Wetness or staining. Any signs of water damage, oil stains, or other contamination?

If You See Damage

If you spot any damage, even minor:

•             Write it on the delivery receipt. Be specific: “Corner of pallet crushed, two doors visible with dented edges” is better than “damaged.” Note every issue you see.

•             Take photographs. Photograph the damage from multiple angles. Include wide shots showing the pallet in context and close-ups of specific damage. Photograph the delivery receipt and the truck if possible.

•             Do not refuse the shipment unless the damage is catastrophic (e.g., the pallet is destroyed and multiple doors are clearly broken). In most cases, it’s better to accept delivery with noted damage so you can do a complete inspection. Refused shipments go back to the carrier’s terminal, where further damage can occur.

If Damage Is Severe

Per doorbuyer.com’s shipping damage policy, if the damage is severe, you may refuse the shipment and contact us immediately. Call us at +1 (866) 711-1616 (Monday–Friday, 8:00 AM–5:00 PM EST) or email info@doorbuyer.com within 24 hours. We’ll initiate the carrier claim process and work on getting replacement doors into production.

If Everything Looks Good

If the pallet and packaging appear undamaged, sign the delivery receipt and note “subject to inspection” or “contents not fully inspected” if the driver allows it. This protects your right to file a concealed damage claim if you discover issues during unpacking.

Unpacking and Detailed Inspection

Once the driver leaves, it’s time for a thorough inspection of every door.

Unpacking and Detailed InspectionUnpacking and Detailed Inspection

When to Unpack

Unpack your doors as soon as possible, ideally the same day as delivery. The sooner you inspect, the stronger your position if you need to file a damage claim. Per our policy, concealed damage must be reported within 3 business days of delivery.

How to Safely Unpack

1.          Cut banding carefully. Use wire cutters or pliers on the metal or plastic strapping. Hold the strap as you cut, it can snap back with force.

2.          Remove wrapping gently. Cut stretch wrap and packaging with a utility knife, being careful not to score the door surfaces beneath.

3.          Remove one door at a time. Lift each door off the stack carefully. This is a two-person job, grab one end each and lift together.

4.          Set each door on a clean, flat surface for inspection. Lay old blankets or cardboard down first to protect the finish.

Detailed Inspection Checklist

For each door, check the following:

Inspection Point

What to Look For

Overall condition

General appearance, no major defects

Finish quality

Scratches, dents, chips, or marks in the 7-layer lacquer

Edges and corners

Chips, dings, or compression damage

Veneer integrity

Peeling, bubbling, cracking, or delamination of the 0.8mm oak veneer

Surface flatness

Any warping, bowing, or twisting

Hardware cutouts

Clean, accurate cuts for hinges and handles (if applicable)

Dimensions

Measure height and width; verify against your order confirmation

Pre-hung assembly

If pre-hung: check frame, hinges, and swing operation

Document Everything

For every door, take a photo of the full face, both edges, top, and bottom. If you find damage, take close-up photos from multiple angles with good lighting. Include a ruler or measuring tape in the photo for scale. This documentation is essential if you need to file a claim.

Damage Claims and Returns

Despite our careful palletizing and insured LTL freight shipping, transit damage can occasionally occur. Here’s exactly how to handle it, based on our official Orders and Returns policy.

Visible Damage (Noted at Delivery)

If you documented damage on the delivery receipt and took photos:

1.          Contact us within 24 hours at +1 (866) 711-1616 or info@doorbuyer.com.

2.          Provide your order number, photos of the damage, and a copy of the signed delivery receipt with damage notes.

3.          We will initiate the carrier insurance claim on your behalf.

Concealed Damage (Found After Unpacking)

If damage was not visible until you unpacked:

1.          Contact us within 3 business days of delivery.

2.          Submit photos of the damage and the original packaging.

3.          We will work with the carrier to file a concealed damage claim.

Important: The 3-business-day window for concealed damage is critical. After this period, carrier claims become extremely difficult to process. Unpack and inspect promptly.

Manufacturing Defects

Manufacturing DefectsManufacturing Defects

If you discover a defect that isn’t related to shipping, such as a finish flaw, incorrect dimensions, or veneer issue:

1.          Contact us within 10 days of receipt.

2.          Submit photos and our Return Claim Form.

3.          Provide your order number, product description, and a detailed description of the defect.

4.          We will evaluate and offer a remedy: replacement, repair, or refund.

What’s Required for Any Claim

Regardless of the claim type, you’ll need:

•             Original order number and date

•             Product description or SKU

•             Clear photographs of the issue

•             Description of the problem

•             Original invoice or receipt

•             For shipping damage: copy of the delivery receipt (especially if damage was noted)

The Return Authorization Process

All returns require a Return Merchandise Authorization (RMA) number. Never ship a door back without one, unauthorized returns will be refused. Here’s the process:

1.          Contact customer service to initiate the claim.

2.          Submit the Return Claim Form with required documentation.

3.          Receive your RMA number (issued within 3–5 business days).

4.          Ship the product back with the RMA number clearly marked on the package.

5.          We inspect the return within 5–10 business days of receipt.

6.          Refund is processed within 4 weeks.

Important Policy Notes

•             Custom orders (including custom sizes, custom finishes, pre-hung units, and made-to-order products) cannot be returned or refunded once production begins. This is a final-sale policy.

•             Standard (non-custom) products may be returned within 45 days of delivery in original, unopened, uninstalled condition with all original packaging.

•             A 20% restocking fee applies to non-custom buyer-initiated returns.

•             Return shipping costs are the customer’s responsibility unless the return is due to a manufacturing defect.

•             Refunds are issued via your original payment method or wire transfer (wire transfers incur a $25–$45 processing fee).

We strongly recommend inspecting every door immediately upon delivery to stay well within all reporting windows.

The Acclimation Period: Why It’s Critical

You’ve received your doors, inspected them, and everything looks perfect. Now resist the urge to install them immediately. Your doors need time to acclimate, and skipping this step is one of the most common causes of post-installation problems.

What Is Acclimation?

Acclimation is the process of allowing your doors to adjust to the temperature and humidity conditions of the room where they’ll be installed. Wood is a natural, hygroscopic material, it absorbs and releases moisture from the surrounding air. When a door’s moisture content doesn’t match its environment, problems follow.

Why doorbuyer.com Doors Need Acclimation

Our doors feature a solid wood pine core with a 0.8mm natural oak veneer and a protective 7-layer natural lacquer finish. While the lacquer provides excellent moisture resistance, the wood core still responds to environmental changes. Your doors were manufactured in our climate-controlled Orlando facility, your home in Minnesota, Arizona, or Oregon has different conditions.

Recommended Acclimation Time

Minimum: 48–72 hours. Place your doors inside the conditioned space where they will be installed and allow them to rest for at least two to three full days.

Acclimation Requirements

Factor

Requirement

Why It Matters

Temperature

60–80°F (15–27°C)

Extreme heat or cold stresses wood fibers

Humidity

30–50% relative humidity

Too dry = shrinkage and cracking; too wet = swelling and warping

Location

Inside the conditioned living space

Garage, shed, or attic conditions don’t match interior conditions

Duration

48–72 hours minimum

Allows wood moisture content to equalize

What Happens If You Skip Acclimation

Installing a door before it acclimates to your home can cause:

•             Warping. The door bows or twists as one side adjusts faster than the other.

•             Gaps. The door shrinks away from the frame, creating visible gaps and allowing sound to pass through.

•             Sticking. The door swells and binds in the frame, becoming difficult or impossible to open and close.

•             Finish cracking. The 7-layer lacquer can develop micro-cracks as the wood beneath it expands or contracts unevenly.

These problems may not appear immediately, they can develop over days or weeks after installation, making them particularly frustrating.

Seasonal Considerations

•             Winter delivery. Doors arriving in cold weather are especially vulnerable. They’ve been in an unheated truck and may be very cold. Allow extra acclimation time; 72 hours or more and bring them into the heated living space as quickly as possible.

•             Summer delivery. Heat is less damaging than cold, but high humidity in summer can cause swelling. Run your air conditioning or dehumidifier to maintain the 30–50% humidity range.

•             Transitional seasons. Spring and fall are generally ideal for delivery and acclimation, with moderate temperatures and humidity levels.

Proper Storage Conditions

If installation isn’t happening immediately after acclimation, proper storage becomes essential. The wrong conditions can undo all the careful manufacturing and shipping protection.

Temperature

•             Ideal range: 60–80°F (15–27°C)

•             Avoid: Unheated garages in winter (temperatures can drop below freezing), hot attics in summer (temperatures can exceed 130°F), and any space with dramatic temperature swings.

•             Consistency matters. A steady 70°F is better than a space that swings between 55°F and 85°F throughout the day.

Humidity

•             Ideal range: 30–50% relative humidity

•             Too dry (below 30%): Wood loses moisture, shrinks, and can crack. Common in winter with forced-air heating. Use a humidifier if needed.

•             Too wet (above 50%): Wood absorbs moisture, swells, and can warp. Common in summer and in basements. Use a dehumidifier.

•             Invest in a hygrometer. A $10–$20 digital hygrometer lets you monitor humidity in your storage space. It’s the cheapest insurance you can buy.

Location Ranking

Location

Rating

Notes

Inside conditioned living space

★★★★★

Best option - matches installation environment

Climate-controlled garage

★★★★

Good if temperature and humidity are managed

Finished, dry basement

★★★

Acceptable if humidity is controlled

Standard garage (mild climate)

★★

Risky - temperature swings and humidity

Standard garage (extreme climate)

★

Not recommended

Attic, shed, or outdoors

✗

Never store doors in these locations

How to Stack and Store Doors

How you physically position your doors during storage directly affects whether they stay flat and true.

How to Stack and Store DoorsHow to Stack and Store Doors

Horizontal Storage (Recommended)

Flat, horizontal storage is the gold standard:

•             Lay doors flat on a level support surface, sawhorses, lumber across cinder blocks, or the original pallet.

•             Place spacers between each door, foam strips, clean cardboard, or thin wood strips. This prevents finish-to-finish contact (which can cause sticking or marring) and allows air circulation.

•             Support the doors every 2–3 feet along their length. Inadequate support allows sagging, which leads to permanent warping.

•             Keep the stack level. An uneven base transfers stress through the entire stack.

Vertical Storage (Short-Term Only)

If horizontal storage isn’t possible:

•             Lean doors against a wall at a near-vertical angle (80–85 degrees).

•             Support the full length of the door, don’t let the top lean away from the wall while the bottom kicks out.

•             Place padding between the door and the wall to protect the finish.

•             Limit vertical storage to a few days. Gravity pulling on a leaning door over time will cause warping, especially in taller doors.

Spacers and Separators

Between every door in a horizontal stack, place:

•             Foam strips (best for finish protection)

•             Clean cardboard (readily available, effective)

•             Thin wood strips (¼” thick, placed at support points)

Never stack doors with bare faces touching, the lacquer finishes can bond together, especially in warm conditions.

Support and Elevation

•             Never store doors directly on a concrete floor. Concrete wicks moisture from the ground, and that moisture will transfer into the wood through direct contact. Always use pallets, lumber, or sawhorses to elevate doors at least 3–4 inches off the floor.

•             Distribute weight evenly. Three support points across a 6’8” door (one at each end and one in the middle) are the minimum. Four is better.

Stack Height

•             Maximum: 8–10 doors per stack. Beyond that, the weight on the bottom doors can cause compression damage to edges and surfaces.

•             If you have more than 10 doors, create multiple stacks.

Protection During Storage

Even in the right environment, doors face threats from construction activity, dust, and accidental damage.

Short-Term Storage (Up to 2 Weeks)

•             Keep doors in their original packaging. Our factory wrapping provides excellent protection.

•             Store in the conditioned space.

•             Minimize handling, every move is an opportunity for a ding.

Long-Term Storage (2+ Weeks)

•             Remove plastic wrap if storing for more than two weeks. Plastic traps condensation against the wood surface, which can cause finish clouding, mold, or moisture damage.

•             Cover with breathable material, cotton drop cloths, moving blankets, or painter’s tarps (not plastic sheeting).

•             Ensure air can circulate around the stack.

Protect From Construction Hazards

If your home is under renovation while doors are in storage:

•             Dust and debris. Drywall dust, sawdust, and paint overspray are enemies of a lacquer finish. Store doors in a separate room with the door closed, or create a dust barrier with plastic sheeting over a frame (not touching the doors).

•             Direct sunlight and UV. Prolonged UV exposure can fade the natural oak veneer unevenly. Keep doors away from windows or cover windows in the storage area.

•             Moisture and spills. Paint, stain, drywall compound, and water will all damage your doors instantly. Keep all liquids and wet materials far from storage.

•             Physical damage. Construction tools, stacked lumber, and foot traffic are real threats. Designate your door storage area as a protected zone.

Storage Duration Guidelines

Duration

Risk Level

Recommendations

1–2 weeks

Low

Original packaging, conditioned space. Minimal concern.

2–8 weeks

Moderate

Remove plastic wrap, proper stacking, climate control critical. Check weekly.

2–4 months

High

All precautions essential. Monitor humidity/temperature regularly. Check doors for warping bi-weekly.

4+ months

Very High

Not recommended. Extended storage increases risk of warping, finish degradation, and environmental damage regardless of precautions.

A doorbuyer.com advantage: Our 7-day production time means you can time your order to minimize storage. If your installation is scheduled three weeks out, order now, your doors will arrive in 9–14 days, acclimate for 3 days, and be ready to install right on schedule. No need to order months in advance and worry about long-term storage.

Common Storage Mistakes to Avoid

Even experienced contractors make these errors. Don’t join the list:

1.          Storing in an unheated garage in winter. Freezing temperatures stress wood fibers and can crack the finish.

2.          Storing in a hot attic in summer. Attic temperatures can exceed 130°F, hot enough to soften lacquer and warp wood.

3.          Leaning doors against a wall for weeks. Gravity always wins. Warping is inevitable with prolonged vertical storage.

4.          Stacking directly on concrete. Moisture migrates through concrete 24/7. Even “dry” concrete floors transfer moisture.

5.          Leaving in plastic wrap for months. Condensation forms between the plastic and the finish, creating a perfect environment for mold and finish damage.

6.          Storing near HVAC vents. Direct heated or cooled air creates localized temperature and humidity extremes that cause uneven wood movement.

7.          Exposing to direct sunlight. UV fades the natural oak veneer, and the fading will be uneven if only part of the door is exposed.

8.          Storing in a high-traffic construction area. One dropped hammer, one splashed bucket, one leaning sheet of drywall, and you’ve damaged a door.

9.          Skipping the acclimation period. It’s not optional. 48–72 hours minimum.

10.      Not checking doors periodically. Even perfect storage conditions can shift. Check your doors every week or two for warping, moisture, or finish issues.

Pre-Installation Final Check

Installation day is here. Before your installer begins (or before you pick up your tools if going the DIY route, run through this final checklist:

•             Re-inspect every door. Check for any warping, finish damage, or issues that developed during storage.

•             Verify acclimation is complete. Doors should have been in the conditioned space for at least 48–72 hours.

•             Confirm measurements one final time. Measure each door opening and compare to the doors you received. Remember the 3-inch clearance requirement for our frames.

•             Inventory hardware. If your order included hinges, handles, or other hardware, verify everything is present and accounted for.

•             Clean door surfaces. Wipe down each door with a soft, dry cloth to remove any dust accumulated during storage.

•             Plan your installation order. If installing multiple doors, plan the sequence to minimize moving doors through the house.

Frequently Asked Questions

How long does shipping take from doorbuyer.com? Production takes 7 days at our Orlando facility, followed by 2–7 days of LTL freight transit depending on your location. Total time from order to delivery is approximately 9–14 days.

What is LTL freight delivery? LTL (Less Than Truckload) freight is a commercial shipping method where your doors travel on pallets via professional freight carriers. It’s the safest way to ship heavy, finished products like interior doors, far superior to ground shipping services like UPS or FedEx.

Do I need to be home for delivery? Yes. LTL freight delivery requires someone to be present to receive the shipment, inspect the pallet, and sign the delivery receipt. The carrier will schedule a delivery appointment window with you in advance.

What if I find damage after the driver leaves? Contact doorbuyer.com within 3 business days for concealed damage. Submit photos of the damage and the original packaging. We’ll work with the carrier to file a claim. The sooner you report, the stronger the claim.

How long should I acclimate doors before installation? A minimum of 48–72 hours in the conditioned space where the doors will be installed. Temperature should be 60–80°F and humidity 30–50%. Winter deliveries may need longer, up to 72 hours or more.

Can I store doors in my garage? Only if your garage is climate-controlled with consistent temperature (60–80°F) and humidity (30–50%). Standard garages, especially in regions with hot summers or cold winters, are not suitable for door storage.

How should I stack multiple doors? Horizontally on a flat, level surface with spacers between each door. Support every 2–3 feet along the length. Elevate off the floor on pallets or sawhorses. Maximum 8–10 doors per stack.

Can I install doors immediately after delivery? We strongly recommend against it. Allow 48–72 hours for acclimation to your home’s temperature and humidity conditions. Installing immediately risks warping, gaps, sticking, and finish cracking as the wood adjusts.

What if doors arrive during winter or summer extremes? Bring them into the conditioned living space as quickly as possible. In winter, allow extra acclimation time for doors to warm gradually. In summer, ensure air conditioning is running to control humidity. Avoid leaving doors in an unheated or un-air-conditioned space.

How do I file a damage claim with doorbuyer.com? Contact us at +1 (866) 711-1616 or info@doorbuyer.com. Provide your order number, photos, and a description of the damage. For visible shipping damage, contact within 24 hours. For concealed damage, contact within 3 business days. For manufacturing defects, contact within 10 days.

Are doors insured during shipping? Yes. All doorbuyer.com shipments are insured against transit damage. Our LTL freight shipping includes insurance coverage, and we’ll handle the carrier claim process if damage occurs.

What’s the best way to protect doors during active construction? Store them in a separate, closed room away from construction activity. Cover with breathable material (not plastic). Maintain climate control. Keep all liquids, tools, and construction debris away from the storage area. Check doors regularly for dust accumulation or accidental damage.

Protect Your Investment from Day One

Your doorbuyer.com doors were crafted with precision solid pine cores, natural oak veneer, 7-layer lacquer finish, and cut to your exact specifications on our 13 CNC machines in Orlando. They left our facility in perfect condition, and they arrived at your home protected by professional LTL freight shipping on insured, palletized shipments.

Now it’s your turn to maintain that quality through proper receiving, thorough inspection, and careful storage. Inspect before signing. Report damage immediately. Acclimate for 48–72 hours. Store flat, climate-controlled, and protected.

Do these things, and your doors will be flawless on installation day, and for years to come, backed by our 10-year warranty.

Ready to order? Visit doorbuyer.com to explore our full collection of interior doors. Have questions about receiving or storing your doors? Call us at +1 (866) 711-1616 or email info@doorbuyer.com, Monday through Friday, 8:00 AM to 5:00 PM EST. We’re here to help from order to installation.